Posted by ewise23 Oct 05th 10:50 PM

A permittee shall pay the cost of relocating a public utility’s storm water drainage improvement, water and waste water mains and facilities, electrical equipment, traffic signal equipment, communications equipment, or trees required by the permittee’s proposed construction.

There should be a timeline associated with the reinstallation of transportation facilities. Ex. the protected bike lane along Rio Grande through West Campus has been removed for construction, and after construction has been completed is still missing.